JV Poltava Petroleum Company has special permits for geological exploration including pre-development in the Zaplavske and Yelyzavetivske prospects and in the Chervonoyarske filed (East).
The Company has special permits for utilization of mineral deposits and production of hydrocarbon liquids in the following fields:
- Ignatovskoye;
- Molchanovskoye;
- Novonickolayevskoye;
- Rudenkovskoye.
|
| Drilling: |
- 21 exploration/appraisal wells;
- 5 development wells;
- 3 sidetracks;
- 1 exploration well.
|
| Workover: |
|
| Constructed: |
- Production Site;
- Early Production Facilities;
- Permanent Load Facilities;
- Oil Tank Farm Installed.
|
| New facilities: |
- Dew Point Control equipment;
- Automated Control System for production processes at the EPF;
- Modern high capacity compressors to export low pressure gas;
- Additional manifold;
- Additional oil tanks with total capacity of 4,000 cu m;
- New automatic ignition flares.
|
| Installed: |
- PLF upgraded with installation of two oil tanks, each with capacity of 4000 m3.
|
| Pipe Laying: |
- 40 km oil and gas pipelines;
- about 130 km of flowlines.
|